Paving Epping

Paving in Epping, Cape Town

Paving Wiz lays yards, hardstanding, loading areas and access roads in Epping Industria and the surrounding industrial blocks. Industrial paving is a different job from a domestic driveway. The surface is the same idea; the numbers underneath it are not.

Axle load sets everything

A car puts something under a tonne through four contact patches. A loaded delivery truck puts several tonnes through each axle, and a forklift concentrates its load onto small, hard wheels that do not forgive an uneven surface. The whole build-up — excavation depth, stone thickness, paver thickness, joint width — comes off that number.

The first thing we need for an Epping quote is what drives on it and how often. Not the average. The heaviest.

Why paving rather than a concrete slab

A concrete yard that fails has to be broken out and recast, and the business loses the use of that area for as long as it takes to cure. A paved yard that fails is lifted in the affected square metres, the base is corrected, and the same blocks go back down the same week. On a working site that difference matters more than the rate per square metre does.

Phasing so the yard keeps working

Phase Typical duration What stays open
Section 1, rear yard 3 – 5 days Front access and loading bay
Section 2, loading apron 2 – 4 days Rear yard, now complete
Section 3, parking 2 – 3 days All operational areas
Bay marking and line work 1 day Everything

What it costs in Epping

Industrial rates are quoted per square metre off the axle load and the area. Larger areas bring the rate down.

Use Paver Installed rate
Staff parking 50 – 60mm R300 – R400/m²
Light delivery and bakkies 60mm herringbone R320 – R450/m²
Loaded trucks and containers 80mm on a heavy base R420 – R620/m²
Forklift working area 80mm, tight joints R450 – R650/m²

Labour on its own is R100 to R200 per square metre. The full breakdown — pavers, labour and sub-base — with more worked examples is on our paving prices Cape Town page.

Epping paving questions

Can you work around our operating hours?

Yes. Yards are normally done in phases so the site keeps running, and each phase is quoted separately.

How much is a 200m² yard?

R64,000 to R98,000 for car and bakkie loading. A truck-rated build over the same area runs higher because of the depth of stone.

Do you do the line marking?

Yes, quoted as a separate line so you can take it or leave it.

Get a written quote in Epping

Tell us what you need paved in Epping, roughly how big it is and what is on the ground now. We come out, measure it, check the fall and put a written figure to it. There is no charge for the visit.

We also cover the rest of the northern suburbs. Related guide: driveway paving in Cape Town.

Prefer to talk? Call 081 408 9946