Paving Tokai

Paving in Tokai, Cape Town

Paving Wiz lays driveways, patios and pool surrounds in Tokai, Steenberg, Bergvliet and Kirstenhof. Plots here are larger and set further back, so the defining feature of a Tokai job is usually length — a driveway that runs twenty or thirty metres from the gate to the garage.

Length changes what can go wrong

A short driveway either works or it does not. A long one can be fine for twenty metres and fail in the last five, because the ground changes along its run. We check levels and dig test holes at more than one point on a long approach, rather than assuming what we find at the gate holds at the garage.

Falls over a long run

Over thirty metres a small error in fall becomes a large puddle. The fall has to be set continuously along the run, and where the natural ground does not cooperate, a cross-fall or a mid-run channel drain does the work. This is the part of a long driveway that separates a good job from an expensive disappointment.

Mature trees along the route

Big established trees line a lot of these driveways, and their roots run out further than the canopy suggests. Where a root crosses the route we either bridge it with a deeper base, set a root barrier, or move the line of the driveway. What we do not do is lay over it and hope.

What it costs in Tokai

On a long driveway the area is what you are paying for, and the rate improves as it grows.

Driveway length at 3.5m wide Area Installed total
10m 35m² R10,500 – R14,700
15m ~53m² R15,900 – R21,200
25m ~88m² R25,500 – R34,300
40m 140m² R40,600 – R54,600

Labour on its own is R100 to R200 per square metre. The full breakdown — pavers, labour and sub-base — with more worked examples is on our paving prices Cape Town page.

Tokai paving questions

How long does a 25-metre driveway take?

Usually four to six days on site, depending on what has to come out first and how the access works for delivering stone.

Can you match paving to an existing section?

Often on a standard colour. Bring us a brick or send a photo with something for scale and we will tell you before you commit.

What does a long driveway cost?

About R25,500 to R34,300 for 25 metres at 3.5m wide in standard grey brick.

Get a written quote in Tokai

Tell us what you need paved in Tokai, roughly how big it is and what is on the ground now. We come out, measure it, check the fall and put a written figure to it. There is no charge for the visit.

We also cover the rest of the southern suburbs. Related guide: exposed aggregate paving in Cape Town.

Prefer to talk? Call 081 408 9946